Dave has been working on the 1975 Triumph TR6. He’s installed a new speedo cable and new clips to go on them. On the original, there was a bad earth connection and it appears that the car had been driven with this happening, which meant the cable had melted. Another problem that he encountered was that the angle box had been destroyed from the drive out of the gearbox. Dave had to, unfortunately, take the interior out to access the drive and speedo cable, which always adds time to the process of anything. He also found there was a missing split pin on the offside bottom trunion.
Dave is now in the process of doing the 4 wheel alignment, which means putting lasers on it and setting up the geometry of it all. Shims have to be put in, to square everything up.