John has been preparing our 1970 Jaguar E-Type Series 2 for its engine to be reinstalled.

A new clutch was fitted and the gearbox and overdrive unit were refitted too. John also painted various suspension pieces black where the paint had chipped off previously.

As the engine installation continued, John began making the connections and refitting the ancillaries. The sump bung thread was bad so the bung wouldn’t tighten. This was stripped and tapped out so a new helicoil could be fitted. The bung was then refitted with PTFE tape and sealer.

The overdrive wires to the gear knob switch split during insulation. John shrink-wrapped these to protect them before fitting the gear leaver. The engine and gearbox oils were filled and the car was tested on the ramp before final fit-up took place. John found that overdrive now worked fine in 4th gear so the reassembly of this classic E-Type could continue.

John went on to refit the front hubs. He also bled the brakes before refitting and tightening the wheels. The radiator was also put back in the car.

The owner of our 1970 Jaguar E-Type Series 2 requested that the steering column bearings were replaced so John made sure this was done. He stripped and removed the column and, as he was doing so, John noticed that it had had its bearings looked at before. The bearings were replaced and the column was spaced out with a large washer. John then refitted the steering column.

Once the steering column was refitted and aligned, John made sure that the old bearings were kept secure for the owner of the car to see. He ran the car up to temperature and the fans cut in as they should.

Our 1970 Jaguar E-Type Series 2 is now ready for its engine installation to be finished this week as John continues his work on this beautiful classic car.