Progress has been further made on our 1976 Maserati Merak engine bay. The plumbing in of the brakes is now complete, the water pipes and vacuum pipes have also been connected up. We’ve replaced all of the pipes on the return system for the brakes. The fuel hoses have been fitted.
John has also successfully installed the Alternator, Brake Pump and Air Conditioning Compressor.
Still a bit of a way to go on this very challenging project but we are certainly getting through it. John has been working tirelessly on this project and it certainly hasn’t come without it’s frustrations.ย It’s when you step back and look at the pure beauty of this machine do you realise that all the hard work and hours are absolutely worth it.
We are now on the look out