Engine plunges into the Ferrari!
On Friday, the newly-built engine was plunged into the bay of the 1979 Arrow Ferrari Daytona, using a heavy duty crane, with Scott and Ady
On Friday, the newly-built engine was plunged into the bay of the 1979 Arrow Ferrari Daytona, using a heavy duty crane, with Scott and Ady
Ady recently finished rebuilding the engine of our Jaguar Mk VII and is now working on fitting it back into the car.
On Friday, the newly-built engine was plunged into the bay of the 1979 Arrow Ferrari Daytona, using a heavy duty crane, with Scott and Ady levering the engine in with the chains. The car originally came to us with an over-heated engine, so wasn’t running. Fortunately, it came with a spare Jaguar V12 engine. The old, blown one was stripped apart and any useful parts were left to be used in the re-building. Scott’s now been re-connecting everything back in the engine bay now it’s in.
Ady recently finished rebuilding the engine of our Jaguar Mk VII and is now working on fitting it back into the car.
We use cookies to deliver the best possible experience whilst visiting our website. By clicking "Accept All", you consent to our use of cookies, or you can manage your preferences by clicking the link below. You can manage your preferences at any time from out Cookie Policy page.