Next Floor Up – Repairing the Floor and Tunnel on the 1987 Daimler Double Six

Next Floor Up – Repairing the Floor and Tunnel on the 1987 Daimler Double Six

Our in-house fabricator, Monty, is continuing his work on getting all of the affected metalwork out of the 1987 Daimler Double Six which is in with Bridge Classic Cars for restoration. On this update, Monty has been working on a section of the passenger footwell and bottom of the gearbox tunnel. As you see from […]