John and Jon have been at it again. They have successfully built up and fitted the new rear vents. They have also managed to fit and align the door mouldings.
John has then got to work on rebuilding the front head lights and stripping down the front bumper. The headlight wiper motor linkage was seized so we have stripped down motor to check the operation, which was okay. Then we proceeded to dismantle the linkage and free off the corroded/seized parts of the linkage. It was then greased and rebuilt and the operation checked. When satisfied it was then fitted to the vehicle.
As for the bumpers, they are not in the best state at the rear so we need to weigh up whether it is more costs effective to repair or replace with new.