December 5, 2021

Ship Shape – Working on the Glastron Sea Ray

Our in-house technician Jon has been busy working on the list of jobs to complete on the Glastron Sea Ray speedboat which belongs to our director, Craig.

The next list of jobs to do is to work on getting the newly arrived carburettor in place and all of the throttle linkages hooked up to be able to control the speed part of the name speed boat. Jon methodically worked his way through each part of the linkage (which was very different to the previous unit) to make sure that everything fit up properly and also did not catch or snag on anything it shouldn’t do.

Also while he had the engine lid open, Jon made some new bracket plates for the hinge under the rear seat. He fabricated these using the old pieces for templates.